hiya all,
I've been giving my branch a good hammering on our production squids
and so far its been stable. About all that needs doing now is
the delayed reads stuff, but if I can't get it done by now I'll
have it done in two weeks (just after exams.)
Is there any timeframe on the actual branching of squid-2.5 to squid-2.6 ?
I'd like to know roughly how much time I have.
Thanks,
Adrian
Received on Fri Oct 28 2005 - 01:54:23 MDT
This archive was generated by hypermail pre-2.1.9 : Tue Nov 01 2005 - 12:00:07 MST